validus management consultancy UK

Food & Drinks Case Study

A major UK brewer


Major capacity increase
with no capital expenditure

THE ORGANISATION

A major UK brewery

THE ISSUES / PROBLEMS

  • A new product line was highly successful in the marketplace, leading to demand outstripping supply.
  • Reliance by the client on contract packing eroded product margin and created severe supply chain issues.

PROJECT ACTIVITIES

  • Formed a joint project team to examine capacity, line balancing and speed profiles across the entire process from brewing through to packaging
  • Both speed and availability opportunities were identified and structured problem solving was used to resolve availability and speed issues
  • Issues with the line control logic were also identified, leading to more effective use of line accumulation, increased bottleneck availability and overall increase in line OEE.

PROJECT RESULTS

  • The overall capacity of the line was increased through a step change, from 59% OEE to 78% OEE
  • Reduced the requirement for contract packing by 50%